Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
AI Ideas Knowledge Base
Search
Search
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Research:Question-01-Factor-Performance-Correlation
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Special pages
Page information
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Factor 9: Execution Speed and Productivity Metrics === **Comprehensive productivity measurement framework validation:** Research establishing methodologies for measuring execution speed and efficiency. <blockquote>"Companies implementing comprehensive productivity measurement approaches have seen 20 to 30 percent reduction in customer-reported product defects, 20 percent improvement in employee experience scores, and 60-percentage-point improvement in customer satisfaction ratings. This new approach has been implemented at nearly 20 tech, finance, and pharmaceutical companies, with promising initial results."</blockquote> **Task completion time correlation studies:** Specific research on execution speed metrics and their predictive value. <blockquote>"Cycle time measures the time it takes to get a piece of code from pull request to production and is one of the best indicators of development team efficiency, as it tracks the entire PR process—one of the most challenging parts of development."</blockquote> **Developer efficiency framework validation:** Research establishing frameworks for measuring and improving execution speed. <blockquote>"The SPACE framework is a research-backed method for measuring software engineering team effectiveness across five key dimensions, providing a holistic view of what makes development teams successful."</blockquote> **Build time impact on developer productivity:** Specific correlations between execution efficiency factors and overall performance. <blockquote>"Developer build time measures how long developers wait for their local builds to complete, reflecting the efficiency of local build processes and directly impacting developer productivity and satisfaction. Prolonged build times can disrupt workflow, leading to frustration and a slower development pace."</blockquote> Sources: [https://www.mckinsey.com/industries-technology-media-and-telecommunications/our-insights/yes-you-can-measure-software-developer-productivity Yes, you can measure software developer productivity] - McKinsey; [https://getdx.com/blog/space-metrics/ The SPACE framework: A comprehensive guide to developer productivity] - DX
Summary:
Please note that all contributions to AI Ideas Knowledge Base may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
AI Ideas Knowledge Base:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Toggle limited content width